Projects

At TCM Construction Group we are as at home completing a high end residential refurbishment or extension as we are at working in sensitive or occupied commercial spaces. Some of our recent projects include:

  • Hunters Hill Extension – Completed 2017

Working in conjunction with designers Studio 74, TCM Construction Group were tasked to bring to life this challenging extension of an original Hunters Hill property.

The project included demolition of an existing outdoor entertaining area and construction of new dining room wing consisting of a solid sandstone cavity wall and single span flat roof bridging the new space. The open span nature of the new room allows the twin sets of Bi Fold doors to be fully opened to catch the breeze off the upper reaches of the harbor while the gas fireplace sits nicely recessed in the solid sandstone wall. The roof garden adds another dimension to what was to be an otherwise flat metal roof. Project access was constrained by existing structures and the natural position of the proposed extension on the block. TCM Construction Group thought outside the box to overcome the difficulties and achieve a beautifully appointed living space.

This slideshow requires JavaScript.

  • Mosman House Renovation – Completed 2017

TCM Construction Group were engaged by the client to carry out an extensive renovation of a 1921 built 2 story double brick house in Mosman. Working with the project designers Angela Steyn and Co the project team completed this detailed and beautifully appointed project on time and on budget. The project consisted of a compete strip out of all internal elements including power, water and drainage services, ceilings and all compromised masonry elements. Walls were removed to open the dining and kitchen space and the fire place was completely reconstructed to accommodate the new built in landscape gas fire and TV screen. Key features of the renovation include the new inbuilt landscape gas Fire with in build TV screen to the living room, new ceilings, white set plaster to walls and detail kitchen joinery with Ceaserstone Bench tops, Marble bathroom floor, walls and vanity along with the new Oak herringbone flooring throughout the lower level and new sandstone paving to the entry patio.

This slideshow requires JavaScript.

  • Elevate Wellness Hub Mona Vale – Completed 2016

Working as construction partner with Project One P/L, TCM Construction Group were tasked with the structural and civil aspects of the yoga deck and roof of the new Elevate Wellness Hub fit out. The external area for the proposed deck and roof was at the rear of the shop with the only access being via the front door and through the store off a busy shopping strip. Using small excavators and hand digging we constructed the ground works including footings for the new deck and storm water detention tank and drainage. All materials were hand carried off the main street and through the shop all while the fit out of the internal treatment rooms and steam rooms was being undertaken. TCM Construction Group’s ability to focus on the end result, attention to detail in problem solving and not get bogged down in the difficult nature of the delivery allowed the external works component of this fast paced fit out to be completed on time despite a number of design tweaks that were made during the process.

This slideshow requires JavaScript.

  • Sylvania Vet Hospital Refurbishment – Completed 2016

TCM Construction Group were commissioned by the Sylvania Vet Hospital to carry out the construction of 2 new operating theaters inclusive of medical gas system, exam areas, new power and communication services along with new animal holding areas. Construction of the new areas were undertaken while the vet business remained in operation and we completed the works in 5 weeks with no disruption to the the delivery of the business. TCM staff and contractors worked hand in hand with vet staff to eliminate any potential impacts to animal welfare and by undertaking daily communication sessions with key Vet staff were able to achieve the end goals for the project at the highest level of quality.

  • Jobfit West Ryde Doctors Rooms Fit out  – Completed 2016

The Jobfit West Ryde project was a new doctors consultation rooms constructed in the West Ryde shopping strip. Works included new walls, ceilings, services, joinery and built in furniture. Working off a base design by Graham Bakewell Architects, TCM Construction Group worked to elaborate on, and carry out the construction of new consultation spaces, reception and waiting area. The project was completed in 4 weeks and handed over in time to open for Christmas 2016.